Well, the biggest milestone has been passed. All the painting of the front and sides of the house has been done. That is, the living room, the living room extension, hallway, and the two bedrooms have been completed.  I can’t begin to tell how relieved I am.

There will be a good many touch-ups to do, and things to correct and redo later, but the main job is done.

A few pics…

This is the back bedroom, with the double window facing the backyard. This window is in the roughest shape of all. Will need to be completely redone at a later date.

This is the closet of the back bedroom. Only bad thing about this door was someone painted it with a roller brush at some point. Ugh!

This is the closet door of the front bedroom, with a part of the doorframe and edge of wall that protrudes forward a bit. The windows and doors of this room were in the nicest shape of anywhere in the house.

Tomorrow is the big day: floor sanding.  I dread that…

Old total:  $284.83

New total: $284.83  (no new purchases)

Advertisements